Skip to main content
Resolved1 update

[VIDEO] All You Need To Know About The Kenyatta University Lift Incident

Story-level discussion

Start here

On Monday, a lift inside the post modern library at Kenyatta University crashed with a loud bang sending the students into a panic. The students had thought that it was a terror attack. The 6000 sitting capacity library which was constructed at a cost of Kshs. 700 million (approx) is touted as the best in this side o

What happened

On Monday, a lift inside the post modern library at Kenyatta University crashed with a loud bang sending the students into a panic. The students had thought that it was a terror attack. The 6000 sitting capacity library which was constructed at a cost of Kshs. 700 million (approx) is touted as the best in this side o

No updates yet on this story. Use the composer above to add the first node.