KETRACO has activated a major power project to enhance reliability for Konza Technopolis.
The Konza power project includes a 98-km transmission line and advanced substation.
Story sections
Updates in this story
Where we are so far
KETRACO has activated a major power project to enhance reliability for Konza Technopolis.
Follow this story
Sign in once to follow KETRACO switches on Konza Smart City power project to boost reliability, pin Nyakundi, and come back to the same story as it develops.
Follow thread
Create or open your account, then follow this thread from the story header.
Pick alerts
Choose every update, major updates, daily recap, documents only, or no notifications.
Pin app
Install Nyakundi so push alerts reopen this exact story.
Share link
Use the parent story link when you want the whole evolution to travel together.
Pin Nyakundi
Install the site as an app so followed-story alerts open straight back into the file.
Where we are so far
Key points
Live updates
Newest first. Times are shown on every update; older context continues below.
KETRACO has activated a major power project to enhance reliability for Konza Technopolis.
The Konza power project includes a 98-km transmission line and advanced substation.