Skip to main content
Jump through story Start Story start 1 update
Resolved1 update Updated May 4

How Embakasi West MP George Theuri Spent Ksh. 18 Million To Build A Swimming Pool — Auditor General's Report Exposes

CAPTION: Embakasi West Member of Parliament George Theuri poses next to his multimillion swimming pool. Embakasi West MP George Theuri is on the spot over the construction of a 18 Million Shillings Swimming Pool in Umoja Primary School. Auditor general’s report of 2015/2016 has raised questions about the cost and tend

Sign in to follow Follow this story to get bell alerts when new updates publish.
Follow, alerts and app Choose delivery, pin Nyakundi, or manage this thread.

Follow this story

Sign in once to follow How Embakasi West MP George Theuri Spent Ksh. 18 Million To Build A Swimming Pool — Auditor General's Report Exposes, pin Nyakundi, and come back to the same story as it develops.

Sign in
  1. 1

    Follow thread

    Create or open your account, then follow this thread from the story header.

  2. 2

    Pick alerts

    Choose every update, major updates, daily recap, documents only, or no notifications.

  3. 3

    Pin app

    Install Nyakundi so push alerts reopen this exact story.

  4. 4

    Share link

    Use the parent story link when you want the whole evolution to travel together.

Pin Nyakundi

Install the site as an app so followed-story alerts open straight back into the file.

Story map

Start here

Understand the file, then jump to the newest update or the part you care about.

1 update in this file Updated May 4

Start here

CAPTION: Embakasi West Member of Parliament George Theuri poses next to his multimillion swimming pool. Embakasi West MP George Theuri is on the spot over the construction of a 18 Million...

Read the catch-up

What we know

CAPTION: Embakasi West Member of Parliament George Theuri poses next to his multimillion swimming pool. Embakasi West MP George Theuri is on the spot...

Follow updates

Latest update

How Embakasi West MP George Theuri Spent Ksh. 18 Million To Build A Swimming Pool — Auditor General's Report Exposes

Jump to latest

Visual file

Latest media in this story

Photos and videos from the update stream, linked back to the exact moment they entered the file.

Where we are so far

If you are joining us

Live updates

Latest developments

Newest updates appear first. Older context continues below.

1 update in this file Jump to latest Back to top
Photo
Update link
Nyakundi Report

How Embakasi West MP George Theuri Spent Ksh. 18 Million To Build A Swimming Pool — Auditor General's Report Exposes

Media in this update

1 item
Photo

Photo

Photo

CAPTION: Embakasi West Member of Parliament George Theuri poses next to his multimillion swimming pool. Embakasi West MP George Theuri is on the spot over the construction of a 18 Million Shillings Swimming Pool in Umoja Primary School. Auditor general’s report of 2015/2016 has raised questions about the cost and tendering process of the swimming pool which was procured through a strict tendering process. Bradley Ouna CEO of Concerned Citizens NGO says that they have written to the Director of Public Prosecutions and the DCI to investigate the alleged misappropriation of funds in Embakasi West Constituency. “Our research shows that a swimming pool of that caliber should cost approximately Sh. 4.5 Million or sh. 5 Million only. The question is...

Source: nyakundireportblog Linked source