This archive report was first published on 9 September 2019.
Kenya Airports Authority has issued a warning to the public regarding a road closure at the south end of Jomo Kenyatta International Airport. The private earth road, which was opened during the construction of the Standard Gauge Railway (SGR), will be closed from September 10, 2019.
The road was opened following a request by Kenya Railways during the construction of the SGR. However, with the construction of this section of the SGR now complete, the road is no longer required.