This archive report was first published on 2 August 2019.
On August 1, 2019, EPRA's former Director General Pavel Oimeke and Oil and Gas Acting Managing Director Edward Kinyua appeared before the Senate Energy Committee to discuss oil spillage and escalating fuel prices.
The Directorate of Criminal Investigations (DCI) may soon revisit the Kenya Pipeline Company (KPC) as investigations into possible collusion in the fuel siphoning syndicate on its new Sh48 billion pipeline intensify.
EPRA noted that failure by the contractor, Zakhem International, to install a mechanism to detect leaks on the pipeline between Mombasa and Nairobi amounted to negligence.
On July 30, 2019, EPRA Director-General Pavel Oimeke wrote to the DCI requesting comprehensive investigations into the failure of KPC to install a leak detection system on Line 5.
Committee Chairman Ephraim Maina questioned whether the loopholes that led to the leak at Kiboko and siphoning of fuel at Mlolongo were introduced during the construction phase.